Day 11: July 25, 2010
Activities:
- Sketching of installation (Fei Jun)
- Initial setup of the physical installation
- Initial coding of PD application to control display of
gesture (mocap) videos onto the array of screens (Jim Ruxton)
Initial Setup of Physical Installation:
- Basic physical layout of the installation prototype
was sketched out by Fei Jun
View Sketch
- Built physical installation based on sketches
(components listed below)
- Materials & components of the physical installation:
- White acetate sheets, 8"x10", 18 pieces
(used to form an array of hanging projection screens)
- Mobile barriers, 2 pieces
(left and right walls of the installation)
- Plastic fishing line
(used to hang the white acetate sheets
at various heights)
- Metal fencing mesh, 14 gauge
('ceiling' of the installation, from which
the acetate sheets/screens were hung)
- Black fabric
(used as the background for the installation)
View images of installation process